{"section":{"heading":"Related Images and Videos (1)","tiles":[{"href":"/en/st/0170464268","title":"All tunnels in the Stuttgart basin have been dug All in all, the miners have dug around 51 kilometers of tunnel Exactly 51,093 meters and this times two, as double tubes This means that a milestone has been reached in the Stuttgart Ulm rail project on the way to commissioning From December 2025, travel ti","thumbnailUrl":"https://www.imago-images.com/bild/st/0170464268/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}