{"section":{"heading":"Related Images and Videos (19)","tiles":[{"href":"/en/st/0860427435","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860427435/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121605","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121605/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121637","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121637/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121653","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121653/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121666","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121666/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121677","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121677/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121766","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121766/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121777","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121777/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121786","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121786/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121794","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. Protests outside Conference Room 26 on June 6, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121794/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121808","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121808/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121817","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121817/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121821","title":"The Stuttgart 21 through station won t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. On the left is Klaus Müller, head of the Stuttgart-Ulm rail project. June 26, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121821/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121829","title":"The Stuttgart 21 through station won’t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir; Klaus Müller, Head of the Stuttgart-Ulm Rail Project, June 26, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121829/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121895","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121895/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121898","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121898/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121902","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir on June 26, 2026, in Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121902/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121904","title":"The Stuttgart 21 through station won t be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir. On the left is Klaus Müller, head of the Stuttgart-Ulm rail project. June 26, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121904/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860121908","title":"The Stuttgart 21 through station will not be completed until 2031 at the earliest, and project costs are climbing to more than 14.5 billion euros. Meeting of the Stuttgart 21 Steering Committee with DB CEO Evelyn Palla and Minister President Cem Özdemir (right), State Minister of Transportation Nicole Razavi, June 26, 2026, Stuttgart, Baden-Württemberg, Germany","thumbnailUrl":"/api/media/860121908/small?db=stock","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}