{"section":{"heading":"Related Images and Videos (2)","tiles":[{"href":"/en/st/0860416308","title":"30-06-2026 Lelystad Queen Maxima with Minister of Economic Affairs Stientje van Veldhoven and Genevieve Prevenier attended the opening of the battery park at the Maxima power plant of energy company Engie, one of the most modern in Europe, recently converted to run on hydrogen as a supplementary fuel, and supplies electricity to nearly two million households in Lelystad. Â  Copyright: xPPEx","thumbnailUrl":"https://www.imago-images.com/bild/st/0860416308/s.jpg","credit":"IMAGO / PPE","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0860416314","title":"30-06-2026 Lelystad Queen Maxima with Minister of Economic Affairs Stientje van Veldhoven and Genevieve Prevenier attended the opening of the battery park at the Maxima power plant of energy company Engie, one of the most modern in Europe, recently converted to run on hydrogen as a supplementary fuel, and supplies electricity to nearly two million households in Lelystad. Â  Copyright: xPPEx","thumbnailUrl":"https://www.imago-images.com/bild/st/0860416314/s.jpg","credit":"IMAGO / PPE","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}