{"section":{"heading":"Related Images and Videos (25)","tiles":[{"href":"/en/st/0862857108","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857108/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857109","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857109/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857110","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857110/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857111","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857111/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857112","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857112/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857116","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857116/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857120","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857120/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857126","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857126/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857130","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857130/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857135","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857135/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857138","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857138/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857142","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857142/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857143","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857143/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857145","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857145/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857147","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857147/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857150","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857150/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857153","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost; the asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, covering a total of over 110,000 square meters, Road rollers; a one-week full closure, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia","thumbnailUrl":"/api/media/862857153/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857176","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857176/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857179","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857179/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857182","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857182/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857184","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857184/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857186","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857186/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857188","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857188/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0862857190","title":"Renovation of the A40 highway between Mülheim Winkhausen and Essen Ost: The asphalt pavement was replaced over a 5.8-kilometer stretch with so-called whisper asphalt (open-pored asphalt) in both directions, totaling over 110,000 square meters; the highway was fully closed for one week, causing severe traffic disruptions in the Ruhr region, Essen, North Rhine-Westphalia, and Germany. Highway","thumbnailUrl":"/api/media/862857190/small?db=stock","credit":"IMAGO / Jochen Tack","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}