{"section":{"heading":"Related Images and Videos (37)","tiles":[{"href":"/en/st/0868136521","title":"Record Construction Time for Four New Bridges at the Herne Highway Interchange: Rapid Construction Method Press Conference by Autobahn GmbH Record Construction Time: The construction of the bridges using prefabricated components marked a first in Germany. Together, the four new bridges form the central structure at the Herne Interchange, photographed here from the south si","thumbnailUrl":"/api/media/868136521/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136524","title":"Record Construction Time for Four New Bridges at the Herne Highway Interchange: Rapid Construction Method Press Conference by Autobahn GmbH Record Construction Time: The construction of the bridges using prefabricated components marked a first in Germany. Together, the four new bridges form the central structure at the Herne Interchange, photographed here from the south si","thumbnailUrl":"/api/media/868136524/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136527","title":"Record Construction Time for Four New Bridges at the Herne Highway Interchange: Rapid Construction Method Press Conference by Autobahn GmbH Record Construction Time: The construction of the bridges using prefabricated components marked a first in Germany. Together, the four new bridges form the central structure at the Herne Interchange, photographed here from the south si","thumbnailUrl":"/api/media/868136527/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136529","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; road closure; the bridge is still closed; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136529/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136530","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; road closure; the bridge is still closed; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136530/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136531","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; the construction of the bridges using prefabricated components marked a first in Germany; the first vehicle to cross the new bridge was a car from the Gelsenkirchen Highway Maintenance Department; Herne, North Rhine-Westphalia,","thumbnailUrl":"/api/media/868136531/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136536","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; German premiere: the construction of the bridges using prefabricated components; barriers; employees of the construction company Brückenbau Echterhoff immediately before the opening; Herne, North Rhine-Westphalia, DEU, Germany,","thumbnailUrl":"/api/media/868136536/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136537","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated elements; the first vehicle to cross the new bridge was a car from the Gelsenkirchen highway maintenance department; Herne, North Rhine-Westphalia, DEU,","thumbnailUrl":"/api/media/868136537/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136538","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference held by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated elements; the first vehicle to cross the new bridge was a car from the Gelsenkirchen highway maintenance department; Herne, North Rhine-Westphalia, DEU,","thumbnailUrl":"/api/media/868136538/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136539","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136539/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136540","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136540/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136541","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136541/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136542","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136542/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136543","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136543/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136544","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136544/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136546","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136546/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136548","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136548/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136549","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136549/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136551","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136551/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136552","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136552/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136554","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136554/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136558","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136558/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136561","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136561/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868136564","title":"Record construction time for four new bridges at the Herne highway interchange; rapid construction method; press conference by Autobahn GmbH; record construction time; a first in Germany was the construction of the bridges using prefabricated components; traffic will resume as usual on the A42 immediately after the bridges open; Herne, North Rhine-Westphalia, DEU, Germany, September 29, 2026","thumbnailUrl":"/api/media/868136564/small?db=stock","credit":"IMAGO / Rüdiger Wölk","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}