{"section":{"heading":"Related Images and Videos (26)","tiles":[{"href":"/en/st/0868631613","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631613/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631612","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631612/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631610","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631610/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631609","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631609/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631608","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631608/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631607","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631607/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631606","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631606/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631605","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631605/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631604","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631604/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631603","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631603/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631602","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631602/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631601","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631601/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631600","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631600/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631598","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631598/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631599","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631599/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631597","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631597/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631596","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631596/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631595","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631595/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631594","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631594/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631592","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631592/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631591","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631591/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631590","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631590/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631589","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631589/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0868631588","title":"CNTV PIPE BREAK Road Construction Site Crater in the Roadway Following a Water Pipe Break on Amsinckstraße in Hamburg on October 5, 2026; Hamburg Water, the Authority for Transportation and Mobility Transition, and the specialized contractors involved are overseeing the work, coordinating the construction site, andrepair in Hamburg, Germany","thumbnailUrl":"https://www.imago-images.com/bild/st/0868631588/s.jpg","credit":"IMAGO / BREUEL-BILD","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}