{"section":{"heading":"Related Images and Videos (17)","tiles":[{"href":"/en/st/0091040743","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by 2023 at the earliest Photo of the 30 04 19 Museum of Islamic Art First Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040743/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040738","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid 2023 at the earliest Photo of 30 04 19 The roof construction over the Pergamon Hall Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040738/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040739","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid 2023 at the earliest Photo of 30 04 19 The roof construction over the Pergamon Hall Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040739/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040740","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid 2023 at the earliest Photo of 30 04 19 The roof construction over the Pergamon Hall Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040740/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040741","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid 2023 at the earliest Photo of 30 04 19 The roof construction over the Pergamon Hall Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040741/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040742","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by 2023 at the earliest Photo of the 30 04 19 Museum of Islamic Art First Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040742/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040744","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by 2023 at the earliest Photo of the 30 04 19 Museum of Islamic Art First Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040744/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040747","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid-2023 at the earliest Photo of 30 04 19 The foyer area of the museum This means that the 477 milli Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040747/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040748","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid-2023 at the earliest Photo of 30 04 19 The foyer area of the museum This means that the 477 milli Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040748/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040749","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid-2023 at the earliest Photo of 30 04 19 The foyer area of the museum This means that the 477 milli Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040749/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040750","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid 2023 at the earliest Photo of the 30 04 19 Newly built staircase in the museum This means Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040750/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040751","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island is to be completed by mid-2023 at the earliest Photo of 30 04 19 The foyer area of the museum This means that the 477 milli Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040751/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040698","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island should be completed by mid 2023 at the earliest Photo of 30 04 19 The Pergamon Hall This means that the 477 million euro construction pr Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040698/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040697","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island should be completed by 2023 at the earliest Photo of the 30 04 19 model of the museum The approximately 477 million euro building proj Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040697/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040700","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island will not be completed until the middle of 2023 at the earliest Photo of the 30 04 19 Pergamon Hall The approximately 477 million euro constr Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040700/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040701","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island will not be completed until the middle of 2023 at the earliest Photo of 30 04 19 The Hellenistic Hall The President of the Federa Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040701/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0091040737","title":"The six-year-old renovation of the north wing and the central part of the Berlin Pergamon Museum on the Museum Island will not be completed until the middle of 2023 at the earliest Photo of 30 04 19 The Hellenistic Hall The President of the Federa Copyright: epd-bild JuergenxBlume EDITORIAL USE ONLY","thumbnailUrl":"/api/media/91040737/small?db=stock","credit":"IMAGO / epd","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}