EditorialCreativeSportsCollectionsVideos
Prices
0Log in

Visual content for professionals.
800M+ images and videos.

Content Hub

  • Current Events
  • Pictures of the Year
  • Sports
  • Editorial
  • Creative
  • Collections
  • Videos

Offers

  • Prices & Packages
  • Promotions
  • Enterprise
  • Newsletter
  • Blog
  • The Game Magazine

Services

  • Content Research
  • Contract Photography
  • API & FTP Push
  • my-picturemaxx
  • Become a Partner

Company

  • About IMAGO
  • Careers
  • News

Help Center

  • FAQ
  • Contact Us
Legal NoticeTerms & ConditionsLicense InformationData PrivacyPrivacy Settings
© 2026 IMAGO
CEPICBAPLABVPA
Back to collections

Spain: Demolition of the cooling towers at the former Endesa coal-fired power station in As Pontes

Jul 30, 2026

The following photos have been selected for you by the IMAGO picture desk on this topic. For more pictures please use the search function.

  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695781
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695786
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695784
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695780
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695779
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695775
  • Demolition of the cooling towers at Endesa’s former thermal power plant in As Pontes, A Coruna Demolition of the cooling towers at Endesa’s former thermal power plant, as of July 30, 2026, in As Pontes, A Coruna, Galicia, Spain. The cooling towers of Endesa’s former thermal power plant—99 meters tall and 84 meters in diameter at the base—were demolished via a controlled blast. The operation is part of the plant’s decommissioning process, which began in 2024 following the permanent closure of the coal-fired power plant and authorization from the Ministry for Ecological Transition. JULY 30, 2026 As Pontes, A Coruna, Galicia As Pontes, A Coruna, Galicia, Spain  Copyright: xCarlosxCastrox 7695623