EditorialCreativeSportsCollectionsVideos
Prices
0Log in

Visual content for professionals.
800M+ images and videos.

Content Hub

  • Current Events
  • Pictures of the Year
  • Sports
  • Editorial
  • Creative
  • Collections
  • Videos

Offers

  • Prices & Packages
  • Promotions
  • Enterprise
  • Newsletter
  • Blog
  • The Game Magazine

Services

  • Content Research
  • Contract Photography
  • API & FTP Push
  • my-picturemaxx
  • Become a Partner

Company

  • About IMAGO
  • Careers
  • News

Help Center

  • FAQ
  • Contact Us
Legal NoticeTerms & ConditionsLicense InformationData PrivacyPrivacy Settings
© 2026 IMAGO
CEPICBAPLABVPA
Back to collections

Thuringia, bridge works at the Erfurt ICE hub

Aug 18, 2026

The following photos have been selected for you by the IMAGO picture desk on this topic. For more pictures please use the search function.

  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Projektleiter Deutsche Bahn Thomas Walter beim Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Junction Erfurt, August 18, 2026 Deutsche Bahn Project Manager Thomas Walter during the excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installe Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installe Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installe Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installe Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installe Copyright: xMarioxGentzelx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After the section was removed, new bridge sections wil Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800 metric tons section of the bridge at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Interchange Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800 metric tons section of the bridge at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Junction Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installed. Copyright: xMatthiasxGränzdörferx
  • News Bilder des Tages Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Junction Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installed. Copyright: xMatthiasxGränzdörferx
  • Brückenarbeiten am ICE-Knoten Erfurt Erfurt, 18.08.2026 Aushub der 38 Meter lange, 13 Meter breite und rund 1.800 Tonnen schwere Brückenteil am Schmidtstedter Knoten Erfurt. Dafür mussten Gleise der ICE - Strecke und die darunter liegenden Fahrbahn gesperrt werden. Nach dem Aushub erfolgt der Einschub neuer Brückenteile. Die Reparatur wurde notwendig, wegen brüchigem Stahlbeton Thüringen Germany *** Bridge Work at the Erfurt ICE Junction Erfurt, August 18, 2026 Excavation of the 38-meter-long, 13-meter-wide, and approximately 1,800-metric-ton bridge section at the Schmidtstedt junction in Erfurt. To do this, tracks on the ICE line and the roadway beneath them had to be closed. After excavation, new bridge sections will be installed. Copyright: xMatthiasxGränzdörferx