Diagram at left shows one final lifting of the 17th century Vasa . Heavy nine-inch wires are drawn under the old oak hull deep into the mud covering the bottom of the Stockholm waterfront. Centre - the two pontoons are drained and the ship rises three metres . New wires are put under the hull and it is again lowered to the bottom. Right - during the lifting of the Vasa whe will be towed gradually into less deep water . All the time , divers are working to repair all small leakages. When the upper deck reaches the surface , the draining starts. 17 April 1961 UnitedArchives00121813

Diagram at left shows one final lifting of the 17th century Vasa . Heavy nine-inch wires are drawn under the old oak hull deep into the mud covering the bottom of the Stockholm waterfront. Centre - the two pontoons are drained and the ship rises three metres . New wires are put under the hull and it is again lowered to the bottom. Right - during the lifting of the Vasa whe will be towed gradually into less deep water . All the time , divers are working to repair all small leakages. When the upper deck reaches the surface , the draining starts. 17 April 1961 UnitedArchives00121813

Choose your license

Rights Managed:

One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.

One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.

Media Info

Credit: United Archives International

Media ID:

Recording Date: Apr 17, 1961

Media Size: 5,019×3,500 Pixels

Diagram at left shows one final lifting of the 17th century Vasa . Heavy nine-inch wires are drawn under the old oak hull deep into the mud covering the bottom of the Stockholm waterfront. Centre - the two pontoons are drained and the ship rises three metres . New wires are put under the hull and it is again lowered to the bottom. Right - during the lifting of the Vasa whe will be towed gradually into less deep water . All the time , divers are working to repair all small leakages. When the upper deck reaches the surface , the draining starts. 17 April 1961 UnitedArchives00121813

Restrictions: This image can only be published in Germany, Switzerland and Austria.

Release Info: Do I need a release?

Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.

Need a custom license?

If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.