(260828) -- GYIRONG, Aug. 28, 2026 -- This screenshot from a video clip shows rescuers heading to the area of a barrier lake for inspection on Aug. 28, 2026. China s Ministry of Water Resources on Thursday activated a level-IV emergency flood response in southwest China s Xizang Autonomous Region as a barrier lake that formed after a mudslide hitting the border port of Gyirong faces a high risk of breaching and sending floodwaters downstream. The mudslide that occurred on Wednesday caused a barrier lake to form near the confluence of two rivers, which had accumulated an estimated 2 million cubic meters of water as of Thursday morning. According to forecasts, inflows into the lake could reach about 3 million cubic meters over the next

(260828) -- GYIRONG, Aug. 28, 2026 -- This screenshot from a video clip shows rescuers heading to the area of a barrier lake for inspection on Aug. 28, 2026. China s Ministry of Water Resources on Thursday activated a level-IV emergency flood response in southwest China s Xizang Autonomous Region as a barrier lake that formed after a mudslide hitting the border port of Gyirong faces a high risk of breaching and sending floodwaters downstream. The mudslide that occurred on Wednesday caused a barrier lake to form near the confluence of two rivers, which had accumulated an estimated 2 million cubic meters of water as of Thursday morning. According to forecasts, inflows into the lake could reach about 3 million cubic meters over the next

Choose your license

Rights Managed:

One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.

One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.

Media Info

Credit: Xinhua

Media ID:

Recording Date: Aug 28, 2026

Media Size: 1,842×1,164 Pixels

(260828) -- GYIRONG, Aug. 28, 2026 -- This screenshot from a video clip shows rescuers heading to the area of a barrier lake for inspection on Aug. 28, 2026. China s Ministry of Water Resources on Thursday activated a level-IV emergency flood response in southwest China s Xizang Autonomous Region as a barrier lake that formed after a mudslide hitting the border port of Gyirong faces a high risk of breaching and sending floodwaters downstream. The mudslide that occurred on Wednesday caused a barrier lake to form near the confluence of two rivers, which had accumulated an estimated 2 million cubic meters of water as of Thursday morning. According to forecasts, inflows into the lake could reach about 3 million cubic meters over the next

Restrictions: This image can not be published in China.

Release Info: Do I need a release?

Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.

Need a custom license?

If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.