Bailey Bridge construction is underway to restore connectivity after the flood at Devighat Nuwakot Nepal , Sep 05 (ANI): Bailey Bridge construction is underway by the Nepali Army over the Tadi River at Devighat after it was damaged by flash floods, in Nuwakot on Saturday. (ANI Video Grab) Nuwakot Bagmati Nepal
Choose your license
Rights Managed:
One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.
One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.
Media Info
Credit: ANI News
Media ID:
Recording Date: Sep 5, 2026
Media Size: 1,920×1,080 Pixels
Bailey Bridge construction is underway to restore connectivity after the flood at Devighat Nuwakot Nepal , Sep 05 (ANI): Bailey Bridge construction is underway by the Nepali Army over the Tadi River at Devighat after it was damaged by flash floods, in Nuwakot on Saturday. (ANI Video Grab) Nuwakot Bagmati Nepal
Release Info: Do I need a release?
Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.
Need a custom license?
If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.
