Modular Bridge Construction Starts in Devighat, Nuwakot Kathmandu, Nepal - Septermber 7, 2026: Members of the Nepal Armys technical engineering team assemble a modular steel bridge over the Tadi River in Devighat, Nuwakot, Nepal. The bridge is being constructed in the aftermath of floods in the Bhotekoshi River that swept away an existing bridge and disrupted road connectivity in Devighat. The new bridge is expected to restore transportation and improve connectivity for local communities in the area. (Photo by AP Tolang Nexpher Images) Nuwakot bagmati
Choose your license
Rights Managed:
One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.
One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.
Media Info
Credit: Nexpher Images
Media ID:
Recording Date: Sep 7, 2026
Media Size: 6,192×4,128 Pixels
Modular Bridge Construction Starts in Devighat, Nuwakot Kathmandu, Nepal - Septermber 7, 2026: Members of the Nepal Armys technical engineering team assemble a modular steel bridge over the Tadi River in Devighat, Nuwakot, Nepal. The bridge is being constructed in the aftermath of floods in the Bhotekoshi River that swept away an existing bridge and disrupted road connectivity in Devighat. The new bridge is expected to restore transportation and improve connectivity for local communities in the area. (Photo by AP Tolang Nexpher Images) Nuwakot bagmati
Release Info: Do I need a release?
Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.
Need a custom license?
If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.
