A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025

A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025

Choose your license

Rights Managed:

One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.

One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.

Media Info

Credit: Achille Abboud

Media ID:

Recording Date: Sep 17, 2026

Media Size: 8,192×5,464 Pixels

A100 Road Resurfacing of the Westend Bridge, Germany, Berlin-Westend, September 17, 2026: Construction site for the new A100 bridge over the Ringbahn tracks, built to replace the prestressed concrete structure that was demolished in the spring of 2025

Release Info: Do I need a release?

Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.

Need a custom license?

If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.