New Highway Bridge in Oberhausen ** FOR ** **Bridge construction A516 Alsfeldstraße Early Sunday morning, October 18, 2026, the second bridge superstructure stands over Alsfeldstraße in Oberhausen and is slowly lowered hydraulically into its final position. Germany, Oberhausen. Copyright GerdxWallhorn
Choose your license
Rights Managed:
One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.
One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.
Media Info
Credit: Funke Foto Services
Media ID:
Recording Date: Oct 18, 2026
Media Size: 1,200×788 Pixels
New Highway Bridge in Oberhausen ** FOR ** **Bridge construction A516 Alsfeldstraße Early Sunday morning, October 18, 2026, the second bridge superstructure stands over Alsfeldstraße in Oberhausen and is slowly lowered hydraulically into its final position. Germany, Oberhausen. Copyright GerdxWallhorn
Release Info: Do I need a release?
Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.
Need a custom license?
If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.
