The blasting of the two boiler houses of the Moorburg coal-fired power plant was only partially successful The second boiler house could not be blown up for unknown reasons and remained standing Hamburg 23 03 2025 Pictures of the first blasting from the ground and drone pictures taken from the unrestricted area Hamburg Germany

The blasting of the two boiler houses of the Moorburg coal-fired power plant was only partially successful The second boiler house could not be blown up for unknown reasons and remained standing Hamburg 23 03 2025 Pictures of the first blasting from the ground and drone pictures taken from the unrestricted area Hamburg Germany

Choose your license

Rights Managed:

One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.

One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.

Media Info

Credit: BREUEL-BILD

Media ID:

Recording Date: Mar 23, 2025

Media Size: 3,462×2,594 Pixels

The blasting of the two boiler houses of the Moorburg coal-fired power plant was only partially successful The second boiler house could not be blown up for unknown reasons and remained standing Hamburg 23 03 2025 Pictures of the first blasting from the ground and drone pictures taken from the unrestricted area Hamburg Germany

Release Info: Do I need a release?

Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.

Need a custom license?

If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.